belvedere / Westmount
Tudor stone house restoration on Belvedere, upper Westmount
A multi-year exterior restoration of a century-old Tudor stone house in upper Westmount, Montreal: stucco repair and painting, Tudor wood beams stained, dormers, metalwork and windows.

The starting point
This Tudor house sits near the top of Westmount, one of the highest points in Montreal. It's over 100 years old, with a massive stone base and classic Tudor gables in stucco and wood: two at the front, two at the back, and one on each side, plus four dormers.
When we first came in, the stucco was greyish, dirty and cracked in places, and the brown stain on the Tudor beams and cornices had faded. Some of the wood was cracked and needed repair. The previous contractors had used stain rather than paint on the wood, which helped protect it over the years.
The process
The owner always planned to restore all four sides. He started with the front, then brought us back for the rest. We've done two seasons so far, with a third planned.
Year one. We restored both front gables and the left side of the house: stucco repair and painting, and staining of all the Tudor wood. We also did the two front dormers, the large metal security gate at the entrance, the stair railings and the double garage door.
Year two. We moved to the back: one rear gable, the two rear dormers and the wood window frames along the back patio. We also made repairs after an animal got into one of the walls.
Year three (planned). The second rear gable, the right side of the house and a small balcony.
Our approach. On every surface, we washed, scraped and removed old caulking, then sanded the wood until it was smooth, with no scraping marks or chipped paint left. We repaired cracked wood and caulked every joint where the stucco meets the wood, along with every cornice and gap. We also made sure every crack in the stucco was properly repaired before painting. The metal gate and railings were scraped, ground, treated for rust, primed and painted.
One of the biggest challenges was the peeling stucco paint on the sides of the house, especially the left side. We spent days on end scraping it all away before any repair or paint could go on.
This job needed some of the largest scaffolding we've ever built, especially along the sides. The dormers were the hardest part. Working on such small, steep spots meant bringing up all our materials at once, fully harnessed, for each step.
Late-season cold slowed the metal primer and paint from drying. We weren't satisfied with how that finish turned out, so we redid it the following year at no cost.
The result
The result: no more cracks in the stucco, which is now a fresh creamy white, and sharp, rich brown Tudor beams and cornices. We kept the colours close to the house's original look. The work is holding up beautifully, and we often send prospective clients to see it. The owners are very happy, and they've become some of our most cherished clients.
Products: Sherwin-Williams Duration (stucco), SICO ProLuxe opaque stain (Tudor beams and cornices), industrial-grade metal primer and metal paint (gate and railings), high-performance exterior caulking.