Skip to the project
All projects

Montrose / Westmount

Basement movie and games room repaint on Montrose Avenue, Westmount

This Westmount basement had spent years as an artist's studio, and the owners wanted to turn it into a movie and games room for the family. We filled the holes left behind by all the artwork, repaired the cracks, and repainted the walls, the ceilings, the trim and the floor.

Interior painting
10 photographs
Finished Montrose room with green walls, white ceiling and trim, and a freshly painted dark floor

This Westmount house isn't a century home. It was built around the seventies or eighties. The basement is the striking part: the main room has ceilings around fifteen or sixteen feet high, with a mezzanine above it that looks down over the whole space, and stairs leading down from it into the room below.

The previous owner used the basement as an art studio. The new owners wanted it to become a games and movie room, with a projector and a big screen, billiards and space to spend time in, plus a small gym on the mezzanine.

What we found. A well-kept basement, but a very dirty one after years as a studio. The walls were full of small holes from hung artwork, and there were some cracks to repair. Most of the art had already been packed up, but we still had to protect it, so it went into the storage spaces and we sealed those off.

The scope. All the walls, all the ceilings, the trim, and the floor. The large windows down there got trim paint too.

The repairs. Mostly filling: a lot of small holes, plus some cracks. Nothing hid a bigger problem behind it.

The lighting. The old lighting was long fluorescent tubes, which didn't suit what the room was becoming. We brought in an electrician we work with to replace them with lights recessed into the ceiling, and to install the projector.

He came in while we were working, which was the right order. He pulled out the old fixtures so we could repair behind them before the ceiling was painted, and cut his holes for the new lights at the same time. We patched and finished all of that, then painted. We arranged the whole thing with him directly, so the owners didn't have to coordinate it.

The high ceilings. The main room's ceilings were the hardest part of the job, simply because of how far up they are, and rolling them took some doing. The mezzanine sits much closer to the ceiling, so that part was easier.

The colours and products. Deep green walls with a white ceiling and white trim. The owners wanted a beautiful colour and finish, so the green is a Farrow & Ball flat, and it came out very nice. With a premium paint like that, the application has to be right, so we took our time with it. The trim is a high-quality Sherwin-Williams trim paint, for a clean white. We kept the lines sharp everywhere the trim meets the walls and the floor.

The floor. Plain flat wood, nothing special, since the room had been a studio. We cleaned it thoroughly and took down any bumps, then used a floor paint so it can take furniture and traffic. The paint covered very well, so it only needed two coats. The floor went last, after everything else.

The job took about a week and a few days.

The owners were happy with the result, and they've hired us for exterior work in the years since.

Products: Farrow & Ball flat (walls), Sherwin-Williams ceiling paint, trim paint, and floor paint.

Next projectArgyle
Have a project in mind?

Tell us about
your home.

Contact us

Photograph viewer