Roslyn / Westmount
Full interior repaint with plaster and trim restoration on Roslyn Avenue, Westmount
A century-old Westmount house that had been painted a weekend at a time by its owners, finished properly across two floors. Cracked plaster rebuilt down to the original lath, decades of chipping paint taken off the doors and trim, and a house that no longer looks tired.

The starting point
This older Westmount house has two floors. The owners had been living there about a year and had started painting it themselves, but with two full-time jobs they could only work on it on weekends. Painting a whole house that way takes a toll, and the job was going very slowly with a lot still left to do. That's when they called us in.
The work covered almost the whole house. Upstairs, the bedrooms, the office and the hallway with its skylight. Downstairs included the entry and main hall, the living room, the kitchen, the dining room, and a small breakfast nook with a built-in bench curving around the bay windows. In between the two floors, the staircase with its railings, spindles and steps. Walls, ceilings, trim and doors were to be painted throughout.
The process
Doors and trim. These are older Westmount doors with panels and profiles, so every joint had to be caulked afterwards, otherwise cracks would show all over them. Some of the baseboard trim was past saving and had to be replaced, including the quarter rounds.
The plaster. Most of the cracks were expected. How deep they went was not. In one of the second-floor rooms, repairs that had been done before weren't holding. It didn't look bad to start with, but once we opened it up we were down to the back of the wall, which in this case is thin wooden lath. One wall came off entirely and was re-plastered. That alone added a good amount of hours to our work.
Finding the right level of work. The owners wanted to keep the budget down, so we started with the lighter approach on the trim and doors: lifting the loose paint, sanding, filling, priming and painting. Once they saw it finished, they wanted something closer to new, which meant going back over work already done and stripping the paint off properly instead.
Sometimes it's difficult for a contractor to gauge how deep to go into refurbishing work, respecting a client's budget while still meeting their expectations for the result. This was one of those cases for us, and we sure learned a lot from the experience.
Working around a family living there. The order mattered, since the owners were in the house the whole time. We started with the main bedroom, because that's what they needed first, then a room that was becoming the office so one of them could get back to work while we carried on. Their office moved into a bedroom for a stretch, then moved back. After that the rest of the bedrooms, the upstairs hall with all the door exteriors and repairs, and then the staircase and railings.
The kitchen was a priority too. We did the cabinets early, while the family was away, because spraying was involved and a room had to be sealed off. It isn't something we take on often, but the result came out very well.
The main floor opened up a lot of repairs. Some of the windows in the breakfast nook weren't closing or opening properly, so we sanded them down to make them usable again. There were crown mouldings, baseboards all throughout, and a long list of doors that needed the attention.
The result
The job took a bit over a month. The house no longer looks old and tired. The baseboards, doors and trim look a world better than when we walked in, and the plaster is solid again.
Products: for this job we mostly used products supplied by Sherwin-Williams.